BEDROCK CONSTRUCTION CO.
EST · 1974 — PERMANENCE BY DESIGN
◆ Project File BR-1974-001 / PRIMARY
◆ Coordinates 40°44'N · 73°59'W
◆ Status ACTIVE — BUILT ENVIRONMENT
◆ Disciplines CIVIL · STRUCTURAL · DESIGN-BUILD

BEDROCK

We engineer permanence. Half a century of building the bones of cities — foundations, towers, infrastructure, and the spaces between them.

Scroll to explore
◆ Selected Numbers 1,247 PROJECTS · 38 CITIES · 0 FATALITIES
DESIGN
EXCAVATE
FOUNDATION
STRUCTURE
ELEVATE
PERMANENCE
DESIGN
EXCAVATE
FOUNDATION
STRUCTURE
ELEVATE
PERMANENCE
SECTION 01 / RECORD

Fifty years in numbers.

0
Projects Delivered
Across 38 cities and 12 countries since incorporation.
%
On-Time Completion
Measured against contracted delivery dates, independently audited.
YRS
Years Of Practice
Three generations of builders, engineers, and craftspeople.
0
Lost-Time Incidents
2,847 consecutive days without a lost-time safety incident.
◆ SITE 047
Construction site
40°44'25"N 73°59'46"W ELEV 47.2M
SECTION 02 / ETHOS

We don't build fast.
We build permanent.

For half a century, BEDROCK has operated on a simple premise: the structures we leave behind outlast all of us. Every foundation poured, every beam hoisted, every wall raised is judged against a single standard — will it still stand, proudly, in a hundred years?

We are engineers, builders, and stewards. We answer to the city, the client, and the craft.

  • 01Design-Build Integration
  • 02Civil & Structural Engineering
  • 03Historic Restoration
  • 04Infrastructure & Heavy Civil
  • 05Sustainability Consulting
SECTION 03 / CAPABILITIES

What we build.

01
FOUNDATION &
SUBSTRUCTURE
Deep foundations, retaining systems, and below-grade construction for projects where ground conditions demand engineering beyond convention.
Piling Caissons Slurry Walls
02
STRUCTURAL
FRAMEWORK
Steel, concrete, and hybrid structural systems. We self-perform erection to control schedule, quality, and the smallest tolerances.
Steel Concrete Hybrid
03
CIVIL
INFRASTRUCTURE
Bridges, transit, utilities, and the connective tissue of cities. Heavy civil work that keeps the public moving safely.
Bridges Transit Utilities
04
ARCHITECTURAL
ENVELOPE
Façade engineering, curtain wall, and building envelope. Where structure meets the elements — and the eye.
Curtain Wall Stone Metal
05
HISTORIC
RESTORATION
Bringing landmark structures back to their original intent — with modern performance hidden inside. Where craft meets code.
Landmarks Masonry Conservation
06
DESIGN-BUILD
DELIVERY
Single-source accountability from concept through commissioning. We design it, we build it, we guarantee it.
Integrated Fast-Track Guaranteed
SECTION 04 / SELECTED WORK

The portfolio.

Meridian Tower
◆ FEATURED
MERIDIAN TOWER · NEW YORK 2023

Meridian Tower

62-story mixed-use · Structural steel + composite core

Foundry District
◆ 02
FOUNDRY · BOSTON 2022

Foundry District

Adaptive reuse · 240,000 SF

Pier 47 Restoration
◆ 03
PIER 47 · SAN FRANCISCO 2021

Pier 47 Restoration

Historic waterfront · Marine rehabilitation

Atlas Bridge
◆ 04
ATLAS BRIDGE · PHILADELPHIA 2024

Atlas Bridge

Cable-stayed span · 1,840 ft main span · Heavy civil

Transit Hub
◆ 05
UNION TRANSIT HUB · CHICAGO 2023

Union Transit Hub

Civic infrastructure · 4.2M annual riders · Design-build

Civic Library
◆ 06
CIVIC LIBRARY · SEATTLE 2020

Civic Library

Public architecture · 89,000 SF

View Full Archive (1,247)
SECTION 05 / METHOD

How we build.

Construction is the discipline of turning intent into matter. Our five-phase method has been refined over five decades — every phase accountable, every handoff documented, every decision traceable.

Construction process
01

Discovery & Site Survey

Geotechnical investigation, zoning analysis, existing-conditions documentation. We measure twice before we ever propose.

⏱ 2—6 WEEKS ◆ DELIVERABLE: FEASIBILITY REPORT
02

Design & Engineering

Schematic design through construction documents. Structural calculations, MEP coordination, and permit-ready drawings.

⏱ 8—24 WEEKS ◆ DELIVERABLE: PERMIT SET
03

Foundation & Substructure

Excavation, shoring, deep foundations, and below-grade waterproofing. The invisible work that everything rests upon.

⏱ 6—20 WEEKS ◆ DELIVERABLE: FOUNDATION CERT
04

Structure & Envelope

Steel erection, concrete pours, façade installation. The building rises — floor by floor, beam by beam.

⏱ 12—52 WEEKS ◆ DELIVERABLE: WEATHER-TIGHT
05

Finishing & Commissioning

Interior fit-out, systems commissioning, QA/QC walkthroughs, and the final handover. We don't leave until it's right.

⏱ 8—32 WEEKS ◆ DELIVERABLE: OCCUPANCY
SECTION 06 / FLEET

The machines.

Tower Cranes

Self-erecting and luffing-jib cranes for high-rise and complex urban sites. Operator-assist systems throughout.

FLEET SIZE14 UNITS
MAX REACH85M
MAX CAPACITY64T

Excavators

Mini to heavy-duty excavation. Grade-control GPS systems on units over 20 tons for millimeter-precision digging.

FLEET SIZE42 UNITS
MAX REACH18M
MAX CAPACITY95T

Concrete Pumps

Boom pumps and stationary placement systems. High-rise concrete placement up to 80 floors without transfer.

FLEET SIZE8 UNITS
MAX REACH62M
OUTPUT200M³/H

Loaders & Haulers

Skid steers, wheel loaders, and articulated dump trucks. Material handling and site logistics at any scale.

FLEET SIZE36 UNITS
BUCKET5.2M³
PAYLOAD40T

Modular Scaffolding

System scaffolds engineered for any façade, structure, or restoration project. OSHA-compliant and load-rated.

INVENTORY48K PCS
MAX HEIGHT120M
LOAD CLASS6 (450KG/M²)

Survey & Layout

Robotic total stations, 3D laser scanners, and drone photogrammetry. We lay out work to ±2mm tolerance.

STATIONS22 UNITS
ACCURACY±2MM
DRONES6 UNITS
SECTION 07 / COMMITMENT

Zero incidents.
Zero exceptions.

Safety isn't a department. It's the operating system. Every BEDROCK site runs the same protocol: daily joint walkthroughs, weekly third-party audits, monthly all-hands safety stand-downs. Everyone on site — from project executive to first-day apprentice — has stop-work authority. No exceptions. No retaliation. No lost-time incidents in 2,847 consecutive days.
0
Days Without Incident
0
Lost-Time Injuries (2024)
0%
OSHA 30 Certified Crew
0.2x
Industry-Below EMR Rate
SECTION 08 / TESTIMONY
"

BEDROCK delivered our tower six weeks ahead of schedule and $4M under the GMP. But what I'll remember is how they handled the unforeseen — when we hit an unmapped transit tunnel during excavation, they had a redesign on our desk in 72 hours.

Author
Marcus Whitfield
DEV PARTNER · WHITFIELD GROUP
SECTION 09 / NEXT MOVE

Let's build
something
permanent.

◆ Headquarters
Pier 47, Brooklyn
NY 11201
By appointment only
◆ New Business
projects@bedrock.co
Response within 48 hours
◆ Direct Line
+1 212 555 0197
Mon—Fri · 7AM—6PM EST