BEDROCK CONSTRUCTION CO.
EST · 1974 — PERMANENCE BY DESIGN
◆ Project File BR-1974-001 / PRIMARY
◆ Coordinates 40°44'N · 73°59'W
◆ Status ACTIVE — BUILT ENVIRONMENT
◆ Disciplines CIVIL · STRUCTURAL · DESIGN-BUILD

BEDROCK

We engineer permanence. Half a century of building the bones of cities — foundations, towers, infrastructure, and the spaces between them.

Scroll to explore
◆ Selected Numbers 1,247 PROJECTS · 38 CITIES · 0 FATALITIES
DESIGN
EXCAVATE
FOUNDATION
STRUCTURE
ELEVATE
PERMANENCE
DESIGN
EXCAVATE
FOUNDATION
STRUCTURE
ELEVATE
PERMANENCE
SECTION 01 / RECORD

Fifty years in numbers.

0
Projects Delivered
Across 38 cities and 12 countries since incorporation.
%
On-Time Completion
Measured against contracted delivery dates, independently audited.
YRS
Years Of Practice
Three generations of builders, engineers, and craftspeople.
0
Lost-Time Incidents
2,847 consecutive days without a lost-time safety incident.
◆ SITE 047
Construction site
40°44'25"N 73°59'46"W ELEV 47.2M
SECTION 02 / ETHOS

We don't build fast.
We build permanent.

For half a century, BEDROCK has operated on a simple premise: the structures we leave behind outlast all of us. Every foundation poured, every beam hoisted, every wall raised is judged against a single standard — will it still stand, proudly, in a hundred years?

We are engineers, builders, and stewards. We answer to the city, the client, and the craft.

  • 01Design-Build Integration→
  • 02Civil & Structural Engineering→
  • 03Historic Restoration→
  • 04Infrastructure & Heavy Civil→
  • 05Sustainability Consulting→
SECTION 03 / CAPABILITIES

What we build.

01
FOUNDATION &
SUBSTRUCTURE
Deep foundations, retaining systems, and below-grade construction for projects where ground conditions demand engineering beyond convention.
Piling Caissons Slurry Walls
→
02
STRUCTURAL
FRAMEWORK
Steel, concrete, and hybrid structural systems. We self-perform erection to control schedule, quality, and the smallest tolerances.
Steel Concrete Hybrid
→
03
CIVIL
INFRASTRUCTURE
Bridges, transit, utilities, and the connective tissue of cities. Heavy civil work that keeps the public moving safely.
Bridges Transit Utilities
→
04
ARCHITECTURAL
ENVELOPE
Façade engineering, curtain wall, and building envelope. Where structure meets the elements — and the eye.
Curtain Wall Stone Metal
→
05
HISTORIC
RESTORATION
Bringing landmark structures back to their original intent — with modern performance hidden inside. Where craft meets code.
Landmarks Masonry Conservation
→
06
DESIGN-BUILD
DELIVERY
Single-source accountability from concept through commissioning. We design it, we build it, we guarantee it.
Integrated Fast-Track Guaranteed
→
SECTION 04 / SELECTED WORK

The portfolio.

Meridian Tower
◆ FEATURED
MERIDIAN TOWER · NEW YORK 2023

Meridian Tower

62-story mixed-use · Structural steel + composite core

Foundry District
◆ 02
FOUNDRY · BOSTON 2022

Foundry District

Adaptive reuse · 240,000 SF

Pier 47 Restoration
◆ 03
PIER 47 · SAN FRANCISCO 2021

Pier 47 Restoration

Historic waterfront · Marine rehabilitation

Atlas Bridge
◆ 04
ATLAS BRIDGE · PHILADELPHIA 2024

Atlas Bridge

Cable-stayed span · 1,840 ft main span · Heavy civil

Transit Hub
◆ 05
UNION TRANSIT HUB · CHICAGO 2023

Union Transit Hub

Civic infrastructure · 4.2M annual riders · Design-build

Civic Library
◆ 06
CIVIC LIBRARY · SEATTLE 2020

Civic Library

Public architecture · 89,000 SF

View Full Archive (1,247) →
SECTION 05 / METHOD

How we build.

Construction is the discipline of turning intent into matter. Our five-phase method has been refined over five decades — every phase accountable, every handoff documented, every decision traceable.

Construction process
01

Discovery & Site Survey

Geotechnical investigation, zoning analysis, existing-conditions documentation. We measure twice before we ever propose.

⏱ 2—6 WEEKS ◆ DELIVERABLE: FEASIBILITY REPORT
02

Design & Engineering

Schematic design through construction documents. Structural calculations, MEP coordination, and permit-ready drawings.

⏱ 8—24 WEEKS ◆ DELIVERABLE: PERMIT SET
03

Foundation & Substructure

Excavation, shoring, deep foundations, and below-grade waterproofing. The invisible work that everything rests upon.

⏱ 6—20 WEEKS ◆ DELIVERABLE: FOUNDATION CERT
04

Structure & Envelope

Steel erection, concrete pours, façade installation. The building rises — floor by floor, beam by beam.

⏱ 12—52 WEEKS ◆ DELIVERABLE: WEATHER-TIGHT
05

Finishing & Commissioning

Interior fit-out, systems commissioning, QA/QC walkthroughs, and the final handover. We don't leave until it's right.

⏱ 8—32 WEEKS ◆ DELIVERABLE: OCCUPANCY
SECTION 06 / FLEET

The machines.

Tower Cranes

Self-erecting and luffing-jib cranes for high-rise and complex urban sites. Operator-assist systems throughout.

FLEET SIZE14 UNITS
MAX REACH85M
MAX CAPACITY64T

Excavators

Mini to heavy-duty excavation. Grade-control GPS systems on units over 20 tons for millimeter-precision digging.

FLEET SIZE42 UNITS
MAX REACH18M
MAX CAPACITY95T

Concrete Pumps

Boom pumps and stationary placement systems. High-rise concrete placement up to 80 floors without transfer.

FLEET SIZE8 UNITS
MAX REACH62M
OUTPUT200M³/H

Loaders & Haulers

Skid steers, wheel loaders, and articulated dump trucks. Material handling and site logistics at any scale.

FLEET SIZE36 UNITS
BUCKET5.2M³
PAYLOAD40T

Modular Scaffolding

System scaffolds engineered for any façade, structure, or restoration project. OSHA-compliant and load-rated.

INVENTORY48K PCS
MAX HEIGHT120M
LOAD CLASS6 (450KG/M²)

Survey & Layout

Robotic total stations, 3D laser scanners, and drone photogrammetry. We lay out work to ±2mm tolerance.

STATIONS22 UNITS
ACCURACY±2MM
DRONES6 UNITS
SECTION 07 / COMMITMENT

Zero incidents.
Zero exceptions.

Safety isn't a department. It's the operating system. Every BEDROCK site runs the same protocol: daily joint walkthroughs, weekly third-party audits, monthly all-hands safety stand-downs. Everyone on site — from project executive to first-day apprentice — has stop-work authority. No exceptions. No retaliation. No lost-time incidents in 2,847 consecutive days.
0
Days Without Incident
0
Lost-Time Injuries (2024)
0%
OSHA 30 Certified Crew
0.2x
Industry-Below EMR Rate
SECTION 08 / TESTIMONY
"

BEDROCK delivered our tower six weeks ahead of schedule and $4M under the GMP. But what I'll remember is how they handled the unforeseen — when we hit an unmapped transit tunnel during excavation, they had a redesign on our desk in 72 hours.

Author
Marcus Whitfield
DEV PARTNER · WHITFIELD GROUP
SECTION 09 / NEXT MOVE

Let's build
something
permanent.

◆ Headquarters
Pier 47, Brooklyn
NY 11201
By appointment only
◆ New Business
projects@bedrock.co
Response within 48 hours
◆ Direct Line
+1 212 555 0197
Mon—Fri · 7AM—6PM EST